TOR_ACP-EUWF_keysheets
5 December, 2005 - 18:20 — Celine Dondeynaz
The objective of this assignment is to improve the utilisation of the EUWF by stimulating/facilitating collaboration with other existing facilities and financial institutions (e.g. the EB Investment Facility, the PIDG initiatives, infrastructure funds, foundations, etc.), with the aim of fostering/leveraging non-ODA, private sector co-financing, to meet the EUWF requirements. The specific objective of this study is to prepare a set of keysheets that give guidance to the potential applicants under the second call for proposals, on how to leverage additional private sector finance.
Attachments
| Attachment | Size | |
|---|---|---|
| ToRs_ACP-EUWF_keysheets.doc | 0 bytes |
